Baldwin Hills CSD - Compliance Documents 2013
Baldwin Hills CSD - Compliance Documents 2013
- E.19 – First Quarter 2013 Groundwater Monitoring Results (PDF)
- E.19 – Second Quarter 2013 Groundwater Monitoring Results (PDF)
- E.19 - Third Quarter 2013 Groundwater Monitoring Results (PDF)
- E.19 - Fourth Quarter 2013 Groundwater Monitoring Results (PDF)
- E.2.j - 2013 Annual MetStation Validation - June 2014 (PDF)
- E.5.j - Worker Notification - Inglewood Quiet Mode Drilling Plan 2013 (PDF)
- E.5.j - Worker Notification - Quiet Mode Contractors 2013 (PDF)
- E.7.b - Invasive Plant Survey Report 2013 (PDF)
- E.7.b - E.7.h -Special Status Species Compliance 2013 Annual Report (PDF)
- E.8.b - Archeological Training - Cultural Resources Contractors 2013 (PDF)
- E.8.b - Archeological Training - Inglewood Cultural Resource Sensitivity Const Treatment Plan 2013 (PDF)
- E.21 - Oil Field Cleanup and Maintenance - Unused Equip Removal Plan 12-2013 (PDF)
- E.30 - Well and Production Reporting
- E.32 - 2013 Abandoned Well Testing Report (PDF)
- F.1.b - Annual EQAP Report - 2013 EQAP (PDF)
- F.3.c - Worker Notification - Inglewood SIMQAP 2013 (PDF)
- F.3.c - Worker Notification - SIMQAP Contractors 2013 (PDF)
- F.4 - Annual Emergency Response Drills - 2013 Sign-in sheet (PDF)
- L.2.a - Odor Minimization Plan - Inglewood Odor Minimization Plan 2013 (PDF)
- L.2.a - Odor Minimization Plan - Odor Minimization Contractors 2013 (PDF)
- L.2.b - Air Monitoring Plan - Inglewood Air Monitoring Plan 2013 (PDF)
- L.2.e - Fugitive Dust Control Plan - Fugitive Dust Plan Contractors 2013 (PDF)
- L.2.e - Fugitive Dust Control Plan - Inglewood Fugitive Dust Control Plan 2013 (PDF)
- L.14 - Oil Filed Cleanup and Maintenance - Unused Equip Removal Plan 12-2013 (PDF)