Baldwin Hills CSD - Compliance Documents 2021
Baldwin Hills CSD - Compliance Documents 2021
- 22.310.050.A.1 – Community Alert Notification System
- 22.310.050.B.3 – Odor Minimization Plan Annual Review
- 22.310.050.B.10 – 2021 Meteorological Station Annual Data Report
- 22.310.050.D.5 - 2021 Ground Movement Survey
- 22.310.050.E.3 – Quite Mode Drilling Plan Annual Review
- 22.310.050.FF – 2021 Abandoned Well Testing Report
- 22.310.050 G.2 - G.8 - 2021 Special Status Species Annual Compliance Report
- 22.310.050.U.1 – Unused or Abandoned Equipment Removal Plan Review
- 22.310.050.S – First Quarter 2021 Groundwater Monitoring Results
- 22.310.050.S – 2021 Second Semiannual Groundwater Monitoring Report
- 22.310.050.Z.3 – Draft Annual Drilling, Redrilling, Well Abandonment, and Well Pad Restoration Plan
- 22.310.050.Z.3 – Approved Annual Drilling, Redrilling, Well Abandonment, and Well Pad Restoration Plan
- 22.310.060.A.2 - 2021 EQAP Report
- 22.310.100.B.2 – Annual Newsletter