TOD Specific Plans
All TODs will be implemented by TOD specific plans, with standards, regulations, and infrastructure plans that tailor to the unique characteristics and needs of each community, and address issues such as access and connectivity, pedestrian improvements, and safety. The TOD specific plans will need to address existing challenges within many of the County’s TODs. For example, many of the transit stations that serve the unincorporated areas are located in the middle of freeways, which limit access to the station, expose residents to traffic and noise pollution, and create hostile environments for pedestrians. The East Los Angeles 3rd Street Specific Plan was adopted in 2014. TOD Specific Plans undertaken as part of the 2015 General Plan Update TOD Implementation Program include: